State of Nevada Commercial Exterior Painting in Las Vegas

We recently completed a commercial exterior for the State of Nevada in Las Vegas. The job covered two buildings, about 35,000 square feet and about 20,000 square feet, and it was exterior only.
A six-person crew spent about four weeks on the work. Before any paint went on, we repaired the loose stucco on the buildings. We used Sherwin-Williams paint, about 350 gallons in all, and a 60-foot boom lift to reach the high and hard-to-reach areas, including the entrance tower around the State of Nevada seal.

The project at a glance
Client: State of Nevada
Location: Las Vegas, Nevada
Scope: exterior only, two buildings (about 35,000 square feet and about 20,000 square feet)
Paint: Sherwin-Williams, about 350 gallons
Crew and schedule: six people, about four weeks
Access: 60-foot boom lift
Prep: all loose stucco repaired before painting
This was not our first State of Nevada exterior in the valley. We previously completed a 12,000 square foot commercial exterior for the state in Las Vegas, which you can read about in this earlier project recap.
Stucco repair and prep
On a Las Vegas commercial exterior, the coating is only as good as the surface under it. Loose or failing stucco will not hold a new film, no matter how carefully the paint is applied. On this job, we repaired all the loose stucco on the buildings first, then moved into the finish work.
The buildings are stucco and tilt-up commercial structures, with roll-up doors along the lower walls. Those openings, along with adjacent surfaces, had to be protected while the walls were coated. That kind of prep is unglamorous, but it is what keeps a large exterior looking even when the job is done.

Reaching the high spots with a 60 ft boom lift
Some of this exterior could be reached from the ground or from ladders. The rest could not. The entrance tower, the high walls, and other hard-to-reach areas needed a 60-foot boom lift.
We used a SkyJack 60-foot boom to get the crew to those surfaces safely and to keep the coating consistent from the lower walls up to the top of the elevations. An airless sprayer handled the open wall area, with the lift putting a painter where the work had to meet the details around the seal, the tower, and the upper walls.

Keeping a working facility safe
This was an active state facility, not an empty site. The parking lot, walkways, and building entries had to stay clear and marked while lifts and hoses were in use.
We used caution tape and cones to mark the work area, kept the boom and spray lines under control, and masked openings such as the roll-up doors so paint stayed on the walls. Site safety on a job like this is not an extra step. It is how you paint a public building without turning the property into a hazard.
The results
When the work was finished, the two buildings had a complete exterior recode: loose stucco repaired, the high areas reached with the 60-foot lift, and about 350 gallons of Sherwin-Williams paint applied over the course of about four weeks.

A project of this size is a useful look at how we handle commercial exteriors in Las Vegas: sound prep, the right access equipment, and a crew that can finish a working facility without shortcuts. For more on this kind of work, see our commercial exterior painting page.
If you have a commercial or government exterior in Las Vegas that needs a repaint, request a free estimate or call 702-286-0401. We are licensed, bonded, and insured, NV #0089575, C-4.

Comments